• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Nerdgineer

One engineer's take on the world as a nerd

  • About
  • Privacy Policy
  • Upcoming rides
You are here: Home / Incomplete design

Incomplete design

Shared on 2025-05-21

Imagine putting this note on an engineering set of “construction-ready” drawings and calling it a day. Seems to be something that is creeping into the industry at the moment, leaving ambiguity between the client and contractor as to who funds this, the client in the end.

I understand the desire for transfer of risk away from the design team, but this just costs more overall because there is now two sets of design liabilities that must be covered, and it may lead to additional design by the contractor (and their subcontractors) that as assumed to be handled by the primary design team.

Filed Under: Uncategorized

Primary Sidebar

About the author

Hello everyone, my name is Andrew. I am a nerd and an engineer. So welcome to Nerdgineer, the blog where I share the details of my journey called life as I attempt to understand life as a whole.

Categories

Copyright © 2026 · Metro Pro on Genesis Framework · WordPress · Log in